
Raw materials
Steel and other specified inputs are prepared for the approved court-component production scope.
Production workflow
Two manufacturing locations with a combined area of 50,000 square metres.
Production capabilities

Steel and other specified inputs are prepared for the approved court-component production scope.

Flat components are cut to the shapes required for the approved drawing set.

Tubular members are cut to the lengths required for structural and supporting components.

Connection and fixing holes are prepared before the next fabrication stage.

Selected parts are formed to the specified geometry before joining.

Prepared steel components are joined into the required subassemblies.

Welded and fabricated parts receive the required finishing preparation.

Components are brought together in the planned assembly sequence for the project scope.

Completed components are prepared and packed for the agreed delivery arrangement.
Quality approach
The workflow follows the approved production scope from material preparation through fabrication, finishing, assembly and packing. Component details and final delivery requirements are confirmed against the project documentation.
Building 3, Aisefu Industrial Park, Yuhe Road, Huiyang District, Huizhou, Guangdong, China
Gaowan Industrial Park, Haixing County, Cangzhou, Hebei, China
Documented evidence
Verification documents apply only to the listed models, submitted samples and standards stated in each record.
Certificate CTGS250307179EC covers listed LDK-SQ01, LDK-SQ02 and LDK-SQ03 models against EN ISO 12100:2010. Issued 13 March 2025.
Report GZIN2602000283CM01_EN records results for the submitted 12 mm glass sample to AS 2208:2023+A1:2024. Issued 25 February 2026.
Use the installation manual version issued for the specific supported court configuration.
Share your site dimensions, destination and required configuration so our team can coordinate the next technical discussion.